# Exit criterion: the test that says a plan step is finished, written when the step is created

Glossary term, read 10 Nov 2026

**The short answer.** The test that says a plan step is finished, written when the step is created. It stops a step being closed because someone said it was done. The example on this page comes from a named vendor's own page, read 10 Nov 2026, and its source is linked at the foot of the page.

## Definition

The test that says a plan step is finished, written when the step is created. It stops a step being closed because someone said it was done.

## An example, sourced

GetAccept's FAQ lists a milestone tracker that shows what is done, what is left and when it is due, with a task breakdown under each milestone; that is where a done test per step is recorded, though the page does not use the term.

## Sources

- https://www.getaccept.com/product/mutual-action-plan (read 10 Nov 2026)