# A proof of concept plan fixes the test, the pass mark and the decision date before it starts

Template, Proof of concept, read 10 Nov 2026

**The short answer.** Twelve steps over thirty-two days. The template writes the hypothesis and the pass test before any setup, assigns a buyer evaluator, and ties the decision meeting to a date, so a pilot ends in a decision and not in a quiet drift.

## When to use it

Use when the buyer wants to test the product on real data or a real team before buying, with a defined group and time box.

## The plan, step by step

Day 0 to day 32

| Day | Step | Owner | Side | Done when |
| --- | --- | --- | --- | --- |
| 0 | Agree the hypothesis | Both: champion and solutions engineer | both | One sentence says what the pilot will prove, written on the plan. |
| 2 | Write the pass test | Buyer: evaluation lead | buyer | Each success criterion has a measure and a pass mark. |
| 3 | Set the time box and decision date | Both: account executive and champion | both | Start, end and decision meeting dates are on the plan. |
| 4 | Name the pilot group | Buyer: evaluation lead | buyer | Named users, with roles, are listed. |
| 5 | Confirm data and access needs | Buyer: IT contact | buyer | Access is granted or a date is set. |
| 7 | Set up the pilot environment | Seller: solutions engineer | seller | The pilot group signs in and sees their own data or content. |
| 8 | Run the kickoff session | Seller: solutions engineer | both | The group has attended and the pass test is reviewed with them. |
| 15 | Check progress at the midpoint | Both: solutions engineer and evaluation lead | both | Each success criterion has a status. |
| 17 | Fix blockers | Seller: solutions engineer | seller | Blockers are logged, assigned and dated. |
| 28 | Record the final results | Buyer: evaluation lead | buyer | Each criterion has a result recorded against its pass mark. |
| 30 | Hold the decision meeting | Both: account executive and economic buyer | both | A decision to buy, extend or stop is recorded. |
| 32 | Convert to the contract plan | Seller: account executive | seller | The pilot results are copied to the contract plan, with the paper process steps added. |

## Where plans like this stall

- Starting without a pass test, which makes the result a matter of taste.
- Letting the pilot run past its time box without a new decision date.
- Testing with enthusiasts only, so the result does not represent the wider team.

## Running it in a tool

The [MAP Tool Matrix](/tools/) shows which tools keep the plan where the buyer already is, send nudges and sync to the CRM; [the tool ranking](/platforms/) weighs the plan at 30 of 100.

## Sources

- Qwilr: templates list includes a sales proof of concept template: https://qwilr.com/templates/mutual-action-plan-template/ (read 10 Nov 2026)
- Dock: templates list includes a sales pilot plan: https://www.dock.us/features/mutual-action-plan (read 10 Nov 2026)
- MEDDICC, MEDDPICC methodology: decision process and paper process: https://meddicc.com/meddpicc-sales-methodology-and-process (read 10 Nov 2026)

Last reviewed 10 Nov 2026. Canonical: https://themutualactionplan.com/templates/proof-of-concept/
